Baltica 2 and Baltic Offshore Wind: Crew Change Logistics from Gdańsk Airport
Baltica 2, the largest offshore wind farm in Polish waters, is being built in the Baltic, and Baltic Power next to it is already producing electricity. Behind every turbine there are technician crews who fly into Gdańsk for their rotation and have to reach the port in Gdańsk, Łeba or Ustka on time. Here are the verified facts about the projects and ports, and practical advice on planning the land leg of a crew change.
Polish offshore wind is no longer a plan on paper. In July 2026 the Baltic Power wind farm (ORLEN and Northland Power), about 23 km off the coast near Łeba and Choczewo, delivered its first electricity to the grid. It is designed for about 1.2 GW and is serviced from the port of Łeba. A few dozen kilometres further west, the largest project in Polish waters is under construction: Baltica 2.
Baltica 2 is a 50/50 joint venture of PGE and Ørsted. The key figures published by the developers and by Poland's Ministry of Energy:
- ✓1.5 GW of capacity, enough for about 2.5 million Polish households.
- ✓107 turbines of 14 MW on monopiles; 111 foundations in total (107 for turbines and 4 for offshore substations).
- ✓About 35–40 km offshore, between Ustka and Łeba, covering roughly 190 km².
- ✓Grid connection and onshore substation in the Choczewo municipality.
- ✓Monopile installation from May 2026 to Q4 2026, turbine installation in 2027, full commissioning planned for the end of 2027.
More is coming. In March 2026 PGE took over the F.E.W. Baltic II project from RWE (350 MW, about 50 km north of Ustka), it is preparing Baltica 1 (896 MW) for the next auction and wants to restart Baltica 3 (about 1 GW) with Ørsted. The December 2025 auction also awarded support to Baltica 9, Baltic East and Bałtyk I. For the coast between Gdańsk and Ustka it all means the same thing: for years of construction and then decades of operation, technician crews will be on the move through Pomerania.
For crew logistics three types of places matter: the installation port, where the turbine installation vessels load; the operations and maintenance (O&M) base, where crew transfer vessels leave every day; and the ports and yards where construction and support vessels are based.
Port of Gdańsk, T5 terminal
A new installation terminal of more than 21 hectares. The vessels installing the 107 Baltica 2 turbines are due to sail from here in 2027, so this is where installation, port and vessel crews will work.
Ustka, PGE Baltica base
The Baltica 2 O&M base on the site of the former Korab plant, about 2.3 ha, with an office and warehouse building and a quay for service vessels. Construction started on 3 June 2025, completion was planned for Q4 2026.
Łeba, Baltic Power base
Poland's first offshore wind service base, in operation since 2025. Technicians servicing Baltic Power sail from here.
Gdynia and Gdańsk
Ports and shipyards where support vessels are based and crews change like on any ship: fly into Gdańsk, hotel or straight on board.
All of these places share one gateway: the nearest large airport with direct flights to Scandinavia, Germany, the UK and the Netherlands is Gdańsk Lech Wałęsa Airport (GDN). This is where most rotations begin.
| From Gdańsk Airport (GDN) to | Distance (approx.) | Driving time (usual) |
|---|---|---|
| Port of Gdańsk, T5 terminal | approx. 32 km | 35–45 min |
| Port of Gdynia | approx. 30 km | 35–45 min |
| Port of Łeba | approx. 100 km | approx. 1 h 30 min |
| Port of Ustka | approx. 145 km | approx. 2 h |
Times are for normal traffic: slower on the Tri-City ring road at rush hour, faster at night. The road to Łeba and Ustka follows the S6 towards Lębork and Słupsk; we cover these directions in detail in Gdańsk Airport taxi to Lębork and Łeba and Gdańsk Airport taxi to Słupsk and Ustka.
Offshore technicians work in rotations, typically a few weeks on the project and a few weeks off. Many of them come from Denmark, Norway, Germany, the UK and the Netherlands, as well as from Poland. Changeover day looks much the same on every project: one group flies in, another flies home, and in between there is an airport, anything from 30 to 150 km of road and a port with a fixed sailing time.
Ground transport is the least visible link in that chain, and one of the most sensitive. A few situations we see again and again:
- ✓Delayed flight. The aircraft lands an hour late and the vessel will not wait. The driver needs the live landing time, not the timetable.
- ✓Split group. Half of the shift connects via Copenhagen, the other half via Oslo or Frankfurt, and they land hours apart.
- ✓Weather days. When the waves are too high, crew transfer vessels stay in port and the whole shift goes to a hotel instead, to be collected early next morning.
- ✓Late arrivals. The last flights land late in the evening, when there is no convenient train to Łeba or Ustka any more.
- ✓Luggage. Every technician has a personal bag and often a tool or workwear bag too. An 8-seat van is not always 8 people with full luggage.
That is why crew transport is less about the price per kilometre and more about predictability: one coordinator who knows the shift plan, drivers who track the flights, and spare capacity when plans change.
If you are writing a request for quotation (RfQ) for crew transport to Gdańsk, Łeba or Ustka, it pays to spell a few things out. This is the list we would like to receive from crewing coordinators:
- ✓24/7 availability, weekends and public holidays included, with no night surcharge.
- ✓Flight tracking and free waiting time counted from the actual landing, not from the scheduled time.
- ✓Vehicles sized to the luggage: cars and vans for up to 8 passengers, several vehicles at once for a larger shift.
- ✓Fixed route rates for the whole project, with clear rules for waiting time, cancellations and return trips.
- ✓One operational contact in English and Polish, reachable at night as well.
- ✓VAT invoices, monthly invoicing with payment terms, purchase order numbers and procurement platforms.
- ✓Flexibility for last-minute changes: weather, rebooked flights, a hotel instead of the port.
We go deeper into setting up the contract, pricing models and what to put in your RfQ in a separate article: offshore crew transport: 8+1 vans, invoicing and fixed project rates.
Taxi Airport Gdańsk is a local transfer company working at Gdańsk Airport since 2018. Every day we drive passengers from the GDN arrivals hall across Pomerania, including the long routes to Łeba, Lębork, Słupsk and Ustka, and for companies we run crew transport and crew changes between the airport and the ports of Gdańsk and Gdynia.
24/7 with flight tracking
The driver follows the live landing time, waits in the arrivals hall with a name board, and 60 minutes of waiting from landing is included.
8+1 vans, several at once
For a full shift we send as many vehicles as it takes for everyone, with personal and tool bags, to arrive together.
Fixed project rates
For regular rotations we agree a fixed price per route for the whole project. Project rates are quoted on request once we know the schedule.
Built for procurement
VAT invoices, monthly invoicing with payment terms, PO numbers and orders through procurement platforms.
We cannot change the Baltic weather. What we can do is take the whole land leg of the crew change off the coordinator's desk, from the arrivals hall to the gangway and back. Our offer for the offshore wind industry is summarised on our crew change transport page, and single-trip prices are in the price list.
- Ørsted, 11.05.2026: Ørsted and PGE kick off offshore installation of Baltica 2
- Ministerstwo Energii (gov.pl), 11.05.2026: Projekt Baltica 2 rusza z budową na morzu
- offshoreWIND.biz, 04.06.2025: Construction kicks off on Baltica 2 O&M base (Ustka)
- Daily Mare, 04.02.2026: Terminal T5 w Porcie Gdańsk jako port instalacyjny Baltica 2
- WindEurope, 15.07.2026: Offshore wind delivers first electricity to Polish grid (Baltic Power)
- RWE, 18.12.2025: sprzedaż projektu F.E.W. Baltic II (350 MW) do PGE
- URE: wyniki aukcji offshore AMWF/1/2025 (grudzień 2025)
Offshore schedules move. Dates are given as announced by the developers and public bodies; check the latest project update before you plan rotations.
Where is the Baltica 2 offshore wind farm?
Baltica 2 is being built in the Polish part of the Baltic Sea, about 35–40 km offshore, off the stretch of coast between Ustka and Łeba. It is planned at 1.5 GW with 107 turbines of 14 MW, enough for about 2.5 million Polish households. PGE and Ørsted each own 50 percent.
When will Baltica 2 be operational?
Offshore works started in May 2026 with monopile foundations, which the developers expect to finish in Q4 2026. Turbine installation from the T5 terminal in the Port of Gdańsk is planned for 2027, and full commissioning for the end of 2027.
Which port will Baltica 2 technicians sail from?
The wind farm will be operated and maintained from the PGE Baltica O&M base in the port of Ustka. Construction started in June 2025 with completion planned for Q4 2026. Crew transfer vessels will take technicians to the turbines from there. The turbines themselves will be installed from the T5 terminal in Gdańsk.
How long is the drive from Gdańsk Airport to Ustka and Łeba?
The port of Ustka is about 145 km from Gdańsk Airport, usually around 2 hours by road. The port of Łeba is about 100 km, usually around 1 hour 30 minutes. The terminals in the Port of Gdańsk and the port of Gdynia are usually 35–45 minutes away, depending on the time of day.
Can you move a whole shift of technicians, not just single passengers?
Yes. We drive cars and vans for up to 8 passengers, and for a bigger shift we send several vehicles at the same time so the whole team reaches the port together. We size the fleet to the luggage as well as the headcount, because tool bags and workwear take more space than suitcases.
How do you invoice offshore companies?
We issue VAT invoices, can invoice monthly with payment terms, work with purchase order numbers and accept orders through procurement platforms. For regular rotations we agree fixed project rates on request, held for the whole contract.